System development for establishing shipyard mid-term production plans using backward process-centric simulation
In this paper, we propose a simulation method based on backward simulation and process-oriented here simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment.The shipyard production planning process was investigated to analyze the detailed process, variab